Gallery Under construction… RF injection trials in the RFQ cavity carried out for the first time from the Central Control RoomScreenshot of the injector oscilloscope during this week operation with 6mm-PETest preparations in front of RF-RFQ modules in RF areaRealignment of the SOL2 magnet of the LEBTLaser trackers in position during the alignment survey in the vault.Photo 2: Data transfer test at F4E GarchingPhoto 1: Data transfer test at Central Control Room in RokkashoPreparation for injector scroll pumps testing (using a new workbench installed in front of the injector to ease maintenance operation). Top view of the last section of the HEBT: from bottom to top, the doublet magnet, the dipole and the second triplet. Extended view of the MEL with the new vacuum chamber for the RGBLM RFQ